Prefabricated Buildings Project
Industry
Construction
Client
PBP China
Service
BIM and Life Cycle Assessment (LCA)
Date
April 2025
We advised on the use of precast hollow floor slabs in PBP China's production process. The results cut carbon emissions by 46.5% compared to the use of traditional slabs in building construction.



